Cut the new gutter pieces using the measurements you took in step one.
How to install gutter diy.
Getting started part.
Steel is stronger and.
For every 10 feet of gutter from this measurement and mark this distance at the low end of the gutter run.
Snap layout lines photo by mary beth montgomery mark the highest point of the gutter run on the fascia 1 inches.
Apply gutter sealant to an end cap then press the cap onto one end of the gutter.
Once all of the pieces have been cut measure a hole for each outlet plug.
If you have a choice between steel and aluminum systems which is best.
Measure the fascia to determine the length of the gutter.
The outlet connects the downspout with the gutter and should be attached via screws or rivets depending on the manufacturer.
Installing gutters in 18 steps snap a chalk line across the fascia creating the proper pitch toward the downspout end.
The slope of a gutter to the downspout should drop 1 inch for every 20 feet of run.
Below the shingles on the high side of the gutter run.
How to install gutters step 1.
Measure and record the distance from the bottom of the fascia board to this nail.
How to install gutters in 8 steps 1.
After aligning the gutter with the string affix a hanger at the downspout end.
To do this place a nail at each end of the gutter run and tie a string between the nails.
You can cut the pieces with a hacksaw or tin snips.
Saw gutter to.
When installing gutters set the proper slope by driving a nail 1 2 in.