When installing gutters set the proper slope by driving a nail 1 2 in.
How to install gutter from higher to lower roof.
Continue down the length of the gutter in the same manner.
How to install gutters.
Below the shingles on the high side of the gutter run.
Tip the hooked end of the bracket under the front flange and press the remaining end over the back fo the gutter.
In almost every instance gutter installers take the path of least resistance and shove the gutter right underneath the roof shingles instead.
Mount the gutter so that the edge without the downspout is slightly higher than the end with the sleeve.
Gutters should be hung where a straight edge laying on your roof shingles can easily extend over the front lip of the gutter this is the proper installment location for the high point of the gutter.
Gutters that are too high can enable runoff water to drip down their back side which in turn can cause deteriorating fascia boards and stains on siding.
On some homes a gutter can look like a rainbow high in the center and low on both ends of the house where the downspout outlet and downspouts are located.
The guttering should run a few inches lower than your roofline.
For every 10 feet of gutter from this measurement and mark this distance at the low end of the gutter run.
With all the necessary fittings attached to this length of gutter install a hanger bracket every 2 to 3 ft.
With help lift the gutter in place and secure the corner first screwing the bracket into the roof s fascia.
You don t need more than 1 4 inch drop towards the downspout for every 10 feet legnth of gutter.
Common gutter screens simply snap into place as follows.
Clip the lip and slide the backside under the gutter.
Measure and record the distance from the bottom of the fascia board to this nail.
Starting at one end of the gutter clip the screen lip to the front of the gutter then slide the backside under the shingles.