Slide the short length of the downspout onto the bottom of the top elbow and slide the top of the lower elbow onto the short length.
How to install house gutters on mobile.
Use an electric drill to create a 3 16 inch 0 48 cm diameter hole into the front side of the gutter.
Most gutters have screws or nails that you can attach it directly to the roofline with but others will be held in brackets that hook up to the shingles.
Attach a fastener in each pre drilled hole in the gutter.
They re affordable low maintenance and come in a wide array of colors to choose from.
Place the gutter against the wall of the mobile home and secure it in place.
On the underside of the sleeve lip apply some sealant and then turn the gutter upright.
For every 10 feet of gutter from this measurement and mark this distance at the low end of the gutter run.
When installing gutters set the proper slope by driving a nail 1 2 in.
Installing gutters is a do it yourself job that pays off many times over whether you intend to stay in your house for the long term or sell at some point in the future.
Measure and record the distance from the bottom of the fascia board to this nail.
Aluminum gutters are the most commonly installed gutters in today s market for an average cost of 5 8 00 per linear ft.
Basics of installing gutters moving roof water away from the house is as basic as letting the water drain into open topped gutters attached directly to the house s fascia.
Install two u shaped downspout brackets on the corner of the house one high and one low.
Secure the gutters to the fascia brackets using machine screws.
Attach an enc cap to each end of the gutter and then use a set of pliers to crimp the cap edges to the gutter.
You can then proceed and insert the sleeve into the hole.
Rivet all joints including the connection with the outlet.
Afterward insert a 1 inch 2 5 cm 8 32 stainless steel machine screw through the hole and cap it with a flanged nut to secure the gutter to the bracket.
Below the shingles on the high side of the gutter run.