You need a tight seal so water doesn t leak through.
How to join aluminum gutters together.
Rivet all joints including the connection with the outlet.
Apply gutter sealant where the two sections fit together.
This is our first video in our tutorial on metal roofing.
First measure the total run of the gutter length needed.
Step 4 attach.
Slide the short length of the downspout onto the bottom of the top elbow and slide the top of the lower elbow onto the short length.
That may even work for the second and third pieces but.
Check the measurements so that the total length of the first and second gutter when put together will equal the length you need plus 4 inches.
The first gutter piece and maybe the second and even a third piece will likely be full 10 ft.
Step 5 measure.
The first piece of the gutter will likely be its full length.
Then wrap the seamer around the butted gutter components from below.
First it is important that you only attempt to install gutters if you re comfortable working on a ladder.
How to assemble metal gutters.
Of insertion on one end.
How to connect two sections of gutters.
It may be best to.
If you have a straight run gable roof measure from shingle to shingle and then add.
Step 1 prepare.
For homeowners with a straight run gable roof measure shingle to shingle and.
Step 2 measure and cut.
Measure the distance between these fittings and cut a short length of downspout to join the allowing for about 1 1 2 in.
First apply gutter sealant or mastic to the top side of the seamer piece.
This is straight joining of gutters by ace gutters pty ltd on vimeo the home for high quality videos and the people who love them.
To join the end drop to the gutter or to join any gutter section to another requires a seamer the seamer is a 3 inch wide piece of aluminum in a k profile to match the gutter.
Add 4 more inches to the length you need.