Cut this piece of roofing to an 18 inch width with a utility knife.
How to nail down roofing felt.
If you have a sloped roof cut strips of roofing 9 inches wide position them flush with the drip edges along the eave and rake and attach them by driving two rows of nails that are about 3 inches apart.
Grab loose pieces of felt and pull them off the roof.
Step 2 roll it out.
In roofing one square equals 100 square feet.
Gently scrub the roof using a bristle.
Valley ridges and hips should have a 6 inch overlap of paper.
Cut drip edge flashing at an angle at the corner press it lightly against the eave end.
All nails and staples should be placed on the lower half of the paper.
Clean the decking as well as.
Apply drip edge to the eave.
Hammer the nails in at 10 inches 25 cm intervals across the roof.
Nail the roofing in place with short roofing nails spaced 6 inches apart.
Step 5 secure ends.
Where a roll ends and a new one is begun the two rolls should be overlapped by four inches.
Dry the roof surface.
Step 3 overhang paper.
Step 1 prep the area.
Clean the roof decking of any debris protruding nails or other objects.
Place this roofing material so it straddles the valley.
Make sure you use a strong hammer and 1 inch 2 5 cm roofing nails.
How to install roofing paper.
Step by step guide on how to apply bituminous roofing felt to your shed roof.
Overlap and cut drip edges.
Includes useful advice on the best materials to use together with information.
Apply and attach drip edge.
Ensure that you hammer the nails properly into the roof don t leave the nails sticking up above the layer.
Use 1 inch nails for new roofing.
You will need 1 10 gallon of lap not mastic cement for every roll and 2 pounds of roofing nails for every square.
Use a trowel to spread roofing cement over half or more of the strips.
Remove old felt from the roof with your hands and a putty knife.
Tack it in place at the corner with the end flush with the end of the roof and the bottom edge of the roll right along the bottom of the roof deck over the drip edge.
An assumption is made all materials are ordered based on the necessary measured requirements.
How to do it.
An underlayment of felt roofing is optional.
They are long enough to penetrate the sheathing.
Roll out about 10 feet of.
Hammer nails into the rolled roofing to secure it.