Diy how to fix loose vinyl siding with a malco sideswiper siding tool.
How to nail into vinyl siding.
Start nailing vertical siding and trim pieces in the top of the uppermost slots to hold them in position.
The trick here to avoid your screw wandering all over the metal trim is to use a nail set or even just a larger nail and tap a small pilot pit into the trim piece.
Vinyl siding must be attached loosely center nails in slots to permit expansion and contraction of the siding.
For best results leave the hook for a day before adding decorations.
Find the tight nails and cut them photo 4.
Remove downspouts lighting fixtures and mouldings.
The screw will stay right there and easily go into the trim.
Hang a wire hook from the vinyl soffit trim.
But i had no idea how to hang things on vinyl siding without damaging it.
The build up of old caulking interferes with the positioning of new.
Slide the bottom row of panels into place making sure to hook the bottom lip of each panel under the starting strip.
I was super worried about committing to nail holes or breaking the wall until i found the perfect hooks for hanging decor on vinyl siding without nails or screws.
Scrape away old caulking around windows and doors.
Allow approximately 1 32 0 8mm clearance about the thickness of a dime between the fastener head and the siding panel.
Have the necessary tools for this diy project lined up before you start you ll save time and frustration.
When installing in temperatures below 40 degrees f increase minimum clearance to 3 8 9 5mm.
Trim is normally applied over solid areas.
Wet the suction cup then press it firmly to the siding.
This is a flat metal sheet with vinyl covering.
Position a nail at the top of the upper slot on both sides of the corner post leaving a gap of approximately 1 32 0 8mm between the nail heads and the corner posts.
Renail right next to the old nail leaving at least a 1 16 in.
Place the corner post in position allowing a 1 4 6 4mm gap between the top of the post and the eave or soffit.
This is the trim that.
Drive nails straight and level to prevent distortion and buckling of panel.
Required tools for this project.
Leave a minimum of 1 4 6 4mm clearance at all openings and stops.
Gap between the nailhead and the vinyl to allow easy movement.