To seal a plumbing vent spread roofing.
How to put up rolled roofing.
Make sure the roofing material is laying flat with no bumps or wrinkles attach the upper edge with the large head.
Plan so that no two butt joints are closer than 2 feet from each other.
Step 6nail the first course match the overhang to the overhang of the starter strip 1 4 to 3 8 from the drip edge.
How to apply roll roofing laying begins at the lowest point.
Use 1 inch nails for new roofing.
Snap a chalk line as a guide for the first layer roofing.
Enlist the help of one or two helpers to handle the long strips.
Do not use the eaves as a guide instead because they can be uneven.
Before you start to fix it you must check its integrity.
How to do it attach first course.
Fix edge fabric roll.
Use 1 nails for re roofing.
Install roll roofing measure 35 inches up from the eaves at several intervals along the roof and mark them.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
They are long enough to penetrate the sheathing.
Valleys will be open so flash them before hand with metal or two layers of roll roofing the first an 18 inch wide strip and the second 36 inches wide.