Remove the drip edge and apply a thin strip of roofing cement at the top edge above the line you marked and slide the drip edge back under the shingles to the mark you made.
How to secure roofing material to drip strip.
You can also use.
Make sure when driving the nails you also flatten the flashing as flat as possible.
Once free slide the drip edge out and discard.
Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto.
Let me know if you need anything else.
Hammer the nails in at 10 inches 25 cm intervals across the roof.
I recommend using 1 trim nail in the center and one on every overlap of the ends.
If necessary secure the ends of the drip edge with short roofing nails.
Use a flat pry bar and hammer to pry the nails out of the drip edge gently.
Secure the drip edge with roofing cement.
To install drip strip it is simple.
It can be done.
Aluminum or stainless trim nails are fine.
Hammer nails into the rolled roofing to secure it.
All you need to do is slide the wider side of the drip strip between the roof edging and the fascia board leaving the 70 degree offset portion of the drip strip hanging out past the back of the gutter.
Drip strip comes in 8 foot lengths in white or musket brown and can be ordered from your local erie materials branch.
Atlantic drain do you have water running behind the gutter.
This is an asphalt based glue that will adhere to almost anything.
Neg s new drip strip installs easily behind the drip edge to prevent water and ice from getting behind the gutter and harming the fascia board.
If there isn t enough room then you could go through the drip edge.
Keep rain in the gutter with drip strip.
It will stop water from going between the facia board and back side of the.
You need drip strip.
If you have enough room i would suggest nailing trough the drip strip into the fascia below the drip edge.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Ensure that you hammer the nails properly into the roof don t leave the nails sticking up above the layer.
Use a roofing nail 1 to tack the drip edge down one every 10 when placing two pieces of drip edge together overlap one end over the other by 1 and secure using two roofing nails one in the back and one in the front.
Open a can of roofing cement.
Make sure you use a strong hammer and 1 inch 2 5 cm roofing nails.