James hardie offers an array of siding and trim products from which to choose.
How to start siding on a house.
Siding should progress up the wall with an even exposure and courses should line up when they meet at a corner.
Nail a piece of plywood about 3 5 inches 89 mm thick along the top of the chalk line this will hold out the bottom of the first row of siding.
For vertical siding install j channel trim.
It is important to check your level every four or five courses by putting a level on the siding.
Cap the corner posts.
Pull up as.
The first piece of vinyl you re going to hang is on the starter strip.
For horizontal siding install f channel trim at the soffit and gable rake.
Snap a level line all the way around your house and make sure it s level.
Install a starter strip.
But don t feel you have to make a drastic change.
For layout the story pole is indispensable.
13 simple vinyl siding installation tips use the wider starter strip.
It will be made of aluminum and it usually comes about 3 inches in width and 12 feet long.
Lay out the job when applying horizontal siding to avoid odd slivers of material above doors and above or below windows.
At the bottoms of windows install under sill trim for horizontal siding and j channel trim for vertical siding.
Nail every 12 inches on center.
Soffit and fascia starting with the soffit nail lengths of j channel against the inner edge of the fascia board.
The bottom of the starter strip the part the bottom panel hooks on to should be at least.
Once you ve decided where you want the siding to begin drive a nail through a point on your chosen starting height and snap a chalk line around the perimeter of the house.
Installing vinyl siding in these 23 steps step 1.
Mice bees and all sorts of other critters love making their home inside vinyl corner posts.
Install trim under eaves rakes.