If you live in an area with inclement weather you should consider using a special ice and water protector.
How to install starter roofing.
Install new flashing metal.
You will want the roof granular side up when applying the strip.
Install a starter strip.
Finally nail the first course of shingles directly on top of and flush with the starter course.
Using four roofing nails or up to six in high wind areas secure the starter shingle to the surface of the roof.
Then move into the attic and apply to the underside of the opening and vent.
Using your staple gun secure the felt to the roof.
Continuing with the starter shingles.
The end should overhang over the edge about 1 4 to 3 4 of an inch.
If possible have the shingles delivered via a boom directly onto the roof.
The adhesive on the starter course seals the tabs of the first full course.
Place the cover over the vent opening and screw into place.
How to do it prep work space.
Where do the nails go.
Before peeling the shingle starter strip trim about 4 inches off an end of the first starter strip and align the strip to the area you are planning to stick it on.
Overlap each row at least 3 to 4 inches.
Quick installation tips for how to install gaf starter strip shingles on a roof.
First snap a line for the top of the.
Drill starter holes if needed then scew down the vent with the fasteners in the installation kit.
Start by laying asphalt felt or other underlayment over the roof.
Do not penetrate the shingles with the hammer.
Apply a second layer of sealant around the lip of the vent outside.
Snap horizontal chalklines to help you keep the courses straight.
Whether installed at the eave or the rake the starter shingles should overhang the edge of the roof by inch to inch.
Typically the finish shingles are then installed to align with the edge of the starters.
Butt the edges together instead of overlapping them.
After the first shingle has been placed on the roof set the second starter shingle next to it.